Tige Ballast System Review with WakeMAKERS

Apr 19, 2013


The engineers at Tige have never been afraid to innovate on the highest level. For 2013 there have been some major improvements to the design and implantation of the factory ballast system. The goal for Tige was to increase speed to reduce the time it takes to fill and drain your ballast tanks. Basically they know your time is worth something and when you are on the boat you do not need to be waiting any longer than you need to. They have blown way past that goal with the incredibly fast 2013 system.

To read the full article, click here!

LET'S RIDE!

Request a Demo.

If you think Tigé's are impressive online, wait until you experience one on the water!

LEARN MORE